Exciting Developments at Solidus Ai Tech Datacenter

We are thrilled to announce a major milestone for Solidus Ai Tech Datacenter. Our Co-Founder, Adrian Stoica, has signed the final contract for the interior installation, setting the stage for significant advancements in the coming weeks. This marks the beginning of a new phase in our project as we prepare to enhance our data center’s capabilities and infrastructure.

Welcoming Vodafone as Our Primary Internet Service Provider

In an exciting development, Vodafone has joined us as one of our primary Internet Service Providers. Vodafone will provide high-speed internet and aerial backup to ensure seamless connectivity and robust performance for our data center. Installation is set to begin soon, bringing us closer to our goal of delivering top-tier data services.

Fire Safety Upgrades: Ensuring Maximum Protection

After a comprehensive inspection by leading fire safety experts, we are undertaking significant upgrades to meet the highest fire safety standards. One of the critical enhancements includes custom-building frames for the side vent panels to ensure an airtight seal throughout the building. These upgrades are essential for mitigating unforeseen hazards and protecting our valuable hardware and servers from potential damage.

Electrical Installations: Progress and Next Steps

In another crucial development, the transformers have been installed in their fittings. This step allows us to proceed with the next stages of electrical installations necessary for the datacenter’s operational readiness. The successful installation of transformers is a key component in ensuring a stable and reliable power supply for our data center.

Interior Installation: Custom Panels and Fire-Resistant Materials

We are pleased to provide an update on the progress of our Data Center interior installation. Custom panels are currently being installed in one of the server rooms to accommodate a portion of our servers. Following this phase, we will move on to the final completion of the wall structures using fire-resistant materials. These measures are vital for maintaining the integrity and safety of our data center environment.

🏢 Data Center Roadmap!

✨ We are thrilled to share the complete roadmap of the Data Center, highlighting the key steps leading to its completion. These steps include:

🔹 Building

-Replace side ventilation panels with dynamic walls / sliding glass windows
– Add extra rain draining pipes
– Fire and utility doors rubber sealing
– Dust / Cleaning / Quartz floor maintenance
– Fire resistance & architectural works
– Landscaping–exterior

🔹 Electrical Network

-MV (medium voltage) power distribution
– MV Switchgear & MCC
– Protection relays
– Distribution transformer
– Active voltage conditioning
– Management–SCADA
– Backup generator: Electrogen 3 phase 400 KVA
– Diesel generators electrification
– Uninterruptible Power Systems (UPS)
– UPS products: UPS Powersave Defender DSP 33100 100 KVA
– Batteries: UPS Legrand Megaline 1250
– Transfer switch
– Building automation
– Remote power panels
– Power measurement (KNX/EIB)
– Security systems
– Lighting system: ECOSUN 3600W
– Security alarms
– Smoke / Fire detectors: SIGA PCD EDWARDS
– LV (low voltage) power distribution
– LV Switchgear & MCC Intelligent PDUs
– Active filters
– Power factor correction: 400KVA
– Network analyzer
– Electric cable: medium tension: 6 meters NA2XS2Y
– Electric cable: low voltage 2200m
– Electric plugs
– Electric busbar: 50x20m / price by weight KG
– Project management and architecture / Plan / Legal

🔹 Data Network Setup

-Network cable
– Network gigabit fibre switches (Mellanox preparation) CISCO
– Network plugs
– Metallic busbar: 50x20m / price by weight KG

🔹 Fire Protection System

-Water tank activation
– Water pit: meters
– Water pit: pipes system: meters

🔹 Ventilation System

-Cooling and ventilation system
– Thermal agent distribution: meters
– Thermal agent distribution: water chillers
– Project documentation book: required by public authorities

🔹 Server Installation

– Installing cabinets
– Installing servers
– Cybersecurity setup

Data Center–Weekly Update Video!